Scenario 5: Loss of Coolant Accident — Emergency Response¶
Reactor: Generic PWR. Pattern: Pattern 9 (7 agents). Primary concept: Full role deployment during LOCA response.
Description¶
The most complex single-event scenario. Seven agents deploy in a Pattern 9 architecture to support operator response to a LOCA: domain experts (RCS, containment), adversarial agent on different model, projection agent coupled to RELAP5, synthesiser, SA bridge, and coordination monitor.
Key Design Elements¶
- Full functional role specialisation from Report 2 Table 5
- Governance gates for all safety-significant recommendations
- Parallel execution model (7 agents × 8s sequential = 56s; parallel ≈ 8s)
- Mode escalation from normal monitoring to emergency configuration
- Flow gates during time-critical phases
- Operator room pause capability